Documents & Packs

Find the right document — or build the pack around it.

Choose a branded editable template, have a specific document prepared for your project, or request a coordinated set of documents for a construction function.

Discuss your project
Construction documents and connected controls

What this can include

Three ways to work with the documents

  • Branded Templates: select an existing master; Second Story Projects applies your logo, colours and business information, then supplies the editable document for your team to complete.
  • Prepared Documents: after reviewing the scope and information, Second Story Projects completes and project-tailors the specific document.
  • Document Packs: coordinated groups of documents supplied together for a specific construction function, with contents and interfaces agreed.

We brand it for you. We prepare it for you. We can manage it with you.

Choose your layout service.

Each level is available for individual documents or an agreed pack. Project-specific content preparation is scoped separately.

Level 1: Studio layout — your branding and colours

Retain the standard Second Story Studio structure and apply your logo, company details and colours.

Simple single: £20–£30
Small pack: £75–£100

First draft: single 2–3 working days; pack 3–5 working days.

Level 2: Your layout — your branding and colours

Restructure styles, tables, headers and footers into your supplied usable layout, logo and colours.

Simple single: £50–£75
Small pack: £175–£250

First draft: single 3–5 working days; pack 5–10 working days.

Level 3: Full rebuild — your branding and colours

Rebuild the agreed structure and design around your brief, logo and colours.

Simple single: From £125, quoted
Small pack: Quoted to scope

First draft: single 5–10 working days; pack 10–15 working days.

Indicative prices before applicable discounts. A simple single covers up to 5 pages; a small coordinated pack covers up to 5 unique documents and 25 pages total, with one brand and consistent layout. Supplied approved content and one consolidated layout revision round are included. Content writing, complex tables, calculations, presentations, specialist assessment and extra revisions are quoted separately. Shared controls in one workbook are scoped together rather than charged again for each catalogue reference.

Receive editable Word files, or Excel where agreed for trackers, plus a PDF copy where suitable. We agree software compatibility and any font/licence requirements. Technical or safety content requires the responsible competent person’s project-specific review.

First-draft estimates in working days (Monday–Friday, excluding England bank holidays), starting once payment, the agreed brief, branding and usable source files are received. Final editable handover follows your review and approval; feedback delays move the schedule. We confirm your start and delivery dates before purchase.

Launch offer through 31 December 2026: a £75 pack on its own receives no standard discount. The 20% offer starts at an eligible order total of £80. Verified eligible Market Corner customers receive 30% regardless of order value, without stacking. Your agreed quote confirms the applicable discount; unpaid quote requests do not count towards a checkout discount.

Select documents in the Studio Store
Second Story Projects cover

Sales catalogue · PDF

Second Story Projects

Services, packages and starting prices, together in one PDF.

Document catalogue

Browse by construction function.

Search by document name or open a category. Explore the full range across 14 construction categories.

01Company Governance29 entries

Company policies, governance controls, responsibilities, registers and management-system records.

  1. 1.01Company Health and Safety Policy
  2. 1.02Health and Safety Responsibilities and Organisation Chart
  3. 1.03General Company Risk Assessment
  4. 1.04Environmental Policy
  5. 1.05Quality Policy
  6. 1.06Document Control Procedure
  7. 1.07Company Master Document Register
  8. 1.08Policy and Document Review Register
  9. 1.09Legal and Compliance Register
  10. 1.10Company Training and Competence Matrix
  11. 1.11Training and Certificate Expiry Tracker
  12. 1.12Competence Assessment Form
  13. 1.13Subcontractor Pre Qualification Questionnaire
  14. 1.14Approved Subcontractor Register
  15. 1.15Approved Supplier Register
  16. 1.16Insurance Register and Expiry Tracker
  17. 1.17Health and Safety Consultation Record
  18. 1.18Accident and Incident Reporting Procedure
  19. 1.19Near Miss Reporting Procedure
  20. 1.20RIDDOR Register
  21. 1.21Company First Aid Needs Assessment
  22. 1.22Occupational Health and Health Surveillance Register
  23. 1.23PPE Issue Register
  24. 1.24RPE and Face Fit Register
  25. 1.25Company Equipment and Asset Register
  26. 1.26Company Audit Schedule
  27. 1.27Internal Audit Report
  28. 1.28Corrective Action Register
  29. 1.29Management Review Record
02Project Mobilisation and Site Setup37 entries

Project information, appointments, pre-start checks, site establishment, inductions and mobilisation records.

  1. 2.01Project Information Sheet
  2. 2.02Project Directory and Contact Sheet
  3. 2.03Client, Principal Designer and Principal Contractor Dutyholder Record
  4. 2.04Appointment Records
  5. 2.05Pre-Construction Information Review Checklist
  6. 2.06F10 Applicability Checklist
  7. 2.07F10 Record and Copy Register
  8. 2.08Site Mobilisation Checklist
  9. 2.09Site Establishment Checklist
  10. 2.10Site Layout Drawing Template and Register
  11. 2.11Site Rules
  12. 2.12AMain Site Induction Presentation
  13. 2.12BSite-Specific Induction and Orientation Presentation
  14. 2.12CIndividual Induction Form and Acceptance Record
  15. 2.12DInduction Register
  16. 2.13Visitor Induction
  17. 2.15Visitor Register
  18. 2.16Site Personnel Register
  19. 2.17Emergency Contacts Sheet
  20. 2.18ASite Emergency Display
  21. 2.18BEmergency Planning and Authorisation Record
  22. 2.19First-Aid Arrangements
  23. 2.20Site First-Aid Needs Assessment
  24. 2.21First-Aider Register
  25. 2.22Welfare Setup Inspection
  26. 2.23Site Security and Access-Control Checklist
  27. 2.24Site Signage Checklist
  28. 2.25Fire Point and Location Register
  29. 2.26Fire Evacuation Drill Record
  30. 2.27Muster Roll
  31. 2.28Site Responsibility Matrix
  32. 2.29Project Document Distribution Matrix
  33. 2.30Construction Phase Plan
  34. 2.31Health and Safety File Information Schedule
  35. 2.32Construction Logistics Plan
  36. 2.33Traffic Management Plan
  37. 2.34Pre-Construction Start Checklist
03RAMS and Risk Control29 entries

Risk assessments, method statements, briefings, coordination and review controls.

  1. 3.01ASite Risk Assessment
  2. 3.02Method Statement Master
  3. 3.03Combined RAMS Master
  4. 3.04RAMS Register
  5. 3.05ACondensed RAMS Review Checklist
  6. 3.05BDetailed RAMS Review and Approval Checklist
  7. 3.05CRAMS Review and Approval Sheet
  8. 3.06ATask and RAMS Briefing Sheet
  9. 3.06BBriefing Attendance and Acknowledgement Record
  10. 3.07Point of Work Dynamic Risk Assessment
  11. 3.08Task Briefing
  12. 3.09Manual Handling Assessment
  13. 3.10Work at Height Assessment
  14. 3.11Noise Assessment
  15. 3.12HAVS Assessment
  16. 3.13Dust and Silica Assessment
  17. 3.14PPE Assessment
  18. 3.15RPE Assessment
  19. 3.16DSEAR Assessment
  20. 3.17Lone Working Assessment
  21. 3.18Young Person Assessment
  22. 3.19New or Expectant Mother Assessment
  23. 3.20COSHH Risk Assessment
  24. 3.21COSHH Register
  25. 3.22Safety Data Sheet Register
  26. 3.23Substance Approval Request
  27. 3.24COSHH Briefing Record
  28. 3.25COSHH Review Tracker
  29. 3.26Hazardous Substance Storage Inspection
04Permit-to-Work22 entries

Permit applications, authorisation, checks, isolations, monitoring and close-out records.

  1. 4.01Master Permit Register
  2. 4.02Hot Works Permit
  3. 4.03Permit to Dig
  4. 4.04Excavation Permit
  5. 4.05Confined Space Permit
  6. 4.06Electrical Isolation Permit
  7. 4.07Mechanical Isolation Permit
  8. 4.08Lock-out/Tag-out Record
  9. 4.09Roof Access Permit
  10. 4.10Fragile Roof Permit
  11. 4.11Work at Height Permit
  12. 4.12Service Penetration / Coring / Drilling Permit
  13. 4.13Breaking Into Existing Services Permit
  14. 4.14Pressure/System Break Permit
  15. 4.15Lifting Operations Permit
  16. 4.16Energisation Permit
  17. 4.17Fire Alarm Isolation Permit
  18. 4.18Sprinkler/Fire-System Impairment Permit
  19. 4.19Demolition Permit
  20. 4.20Restricted-Area Permit
  21. 4.21Temporary Works Permit to Load
  22. 4.22Temporary Works Permit to Strike
05Daily and Weekly Site Management30 entries

Routine site inspections, coordination, briefings, workforce records and daily or weekly controls.

  1. 5.01Site Diary
  2. 5.02Daily Manager Report
  3. 5.03Labour Return
  4. 5.04Attendance Sheet
  5. 5.05Daily Briefing
  6. 5.06Daily Activity Sheet
  7. 5.07Weather Record
  8. 5.08Progress Photo Record
  9. 5.09Deliveries Log
  10. 5.10Visitors Register
  11. 5.11Plant Pre-Use Checks
  12. 5.12Housekeeping Check
  13. 5.13Access/Egress Check
  14. 5.14Daily Excavation Check
  15. 5.15Daily Ladder Pre-Use Record
  16. 5.16General Site H&S Inspection
  17. 5.17Supervisor Inspection
  18. 5.18Welfare Inspection
  19. 5.19Fire Inspection
  20. 5.20Hoarding/Fencing Inspection
  21. 5.21Traffic-Management Inspection
  22. 5.22Environmental Inspection
  23. 5.23Scaffold Inspection
  24. 5.24Tower Scaffold Inspection
  25. 5.25Excavation Inspection
  26. 5.26Ladder Inspection/Register
  27. 5.27Harness/Lanyard Inspection
  28. 5.28First-Aid Equipment Check
  29. 5.29Temporary Electrical Installation Inspection
  30. 5.30Temporary Lighting Inspection
06Plant, PUWER and LOLER29 entries

Plant and equipment registers, inspection controls, lifting operations, defects and evidence records.

  1. 6.01Plant & Equipment Register
  2. 6.02Plant Arrival / Acceptance Check
  3. 6.03Plant Inspection Register
  4. 6.04Maintenance Tracker
  5. 6.05Defect Register
  6. 6.06Operator Competency Register
  7. 6.07Telehandler Pre-Use Check
  8. 6.08Forklift Pre-Use Check
  9. 6.09MEWP Pre-Use Check
  10. 6.10Excavator Pre-Use Check
  11. 6.11Dumper Pre-Use Check
  12. 6.12Generator Pre-Use Check
  13. 6.13Hoist Pre-Use Check
  14. 6.14Abrasive Wheel Equipment Register
  15. 6.15Portable/Temporary Electrical-Equipment Register
  16. 6.16Lifting Equipment Register
  17. 6.17Lifting Accessories Register
  18. 6.18LOLER Certificate Tracker — report verification
  19. 6.19Examination Expiry Tracker
  20. 6.20Defect/Actions Register
  21. 6.21Lifting Accessory Pre-Use Check
  22. 6.22Crane Register
  23. 6.23Lift Plan
  24. 6.24Lift-Plan Register
  25. 6.25Lift Briefing / Sign-off
  26. 6.26Crane Setup Checklist
  27. 6.27Lifting Exclusion-Zone Check
  28. 6.28Lifting-Operation Record
  29. 6.29Appointed Person / Crane Supervisor / Slinger Competency Tracker
07Temporary Works15 entries

Temporary-works coordination, design checks, permits, inspections and status tracking.

  1. 7.01Temporary Works Procedure
  2. 7.02TWC Appointment
  3. 7.03TWS Appointment
  4. 7.04Temporary Works Register
  5. 7.05Design Brief
  6. 7.06Design Category/Classification
  7. 7.07Design Check Record/Certificate
  8. 7.08Design Acceptance (TWC coordination)
  9. 7.09Installation Inspection + Repeat Inspection
  10. 7.10Permit to Load
  11. 7.11Permit to Strike
  12. 7.12Handover
  13. 7.13Change Log + Change Decision Record
  14. 7.14Defect Record
  15. 7.15Designated Individual Appointment
08QA and Quality Control28 entries

Quality plans, ITPs, inspections, non-conformance, corrective action and completion evidence.

  1. 8.01Project Quality Plan
  2. 8.02Master ITP Template
  3. 8.03ITP Register
  4. 8.04Individual ITP
  5. 8.05Work Inspection Request
  6. 8.06Inspection Record
  7. 8.07Hold Point Record
  8. 8.08Witness Point Record
  9. 8.09Benchmark Inspection
  10. 8.10Sample Approval
  11. 8.11Material Approval
  12. 8.12Material/Submittal Register
  13. 8.13Delivery Inspection
  14. 8.14Installation Inspection
  15. 8.15NCR
  16. 8.16NCR Register
  17. 8.17Corrective Action Request
  18. 8.18Quality Observation
  19. 8.19Defect Register
  20. 8.20Snag Register
  21. 8.21De-snag Verification
  22. 8.22Drawing Register
  23. 8.23As-Built Drawing Register
  24. 8.24RFI Register
  25. 8.25TQ Register
  26. 8.26Design Change Register
  27. 8.27Test Certificate Register
  28. 8.28Calibration Register
09Project Controls and Programmes31 entries

Programmes, look-aheads, procurement, design information, risks, actions and change controls.

  1. 9.01Master Project Programme
  2. 9.02Baseline Programme
  3. 9.03Programme Update
  4. 9.04Recovery Programme
  5. 9.052-Week Look-Ahead
  6. 9.064-Week Look-Ahead
  7. 9.076-Week Look-Ahead
  8. 9.08Programme Narrative
  9. 9.09Procurement Schedule
  10. 9.10Long-Lead Schedule
  11. 9.11Design Schedule
  12. 9.12Information-Required Schedule
  13. 9.13Resource/Labour Tracker
  14. 9.14Delivery Schedule
  15. 9.15Action Tracker
  16. 9.16Constraints Register
  17. 9.17Risk Register
  18. 9.18Opportunity Register
  19. 9.19Decision Register
  20. 9.20RFI/TQ Tracker
  21. 9.21Instruction Register
  22. 9.22Change Register
  23. 9.23Variation Tracker
  24. 9.24Delay/Event Tracker
  25. 9.25EOT Tracker
  26. 9.26NEC Early Warning Tracker
  27. 9.27Compensation Event Tracker
  28. 9.28JCT Notice Tracker
  29. 9.29Meeting Minutes
  30. 9.30Document Transmittal
  31. 9.31Correspondence Register
10Reporting17 entries

Progress reports, dashboards, meeting records, commercial and delivery summaries.

  1. 10.01Daily Site Report
  2. 10.02Weekly Project Report
  3. 10.03Monthly Project Report
  4. 10.04Client Report
  5. 10.05Senior Management/Director Report
  6. 10.06Executive Dashboard
  7. 10.07Programme Status Report
  8. 10.08Procurement Report
  9. 10.09Design Report
  10. 10.10Commercial/Change Summary
  11. 10.11H&S Summary
  12. 10.12Quality Summary
  13. 10.13Labour/Resource Report
  14. 10.14Progress Photograph Report
  15. 10.15Look-Ahead Report
  16. 10.16Key-Risk Report
  17. 10.17Handover-Readiness Report
11Environmental16 entries

Environmental planning, monitoring, inspections, waste, pollution and incident records.

  1. 11.01Environmental Aspects/Impacts Register
  2. 11.02Waste Management Plan
  3. 11.03Waste Register
  4. 11.04Waste Transfer Note Register
  5. 11.05Hazardous Waste Consignment Register
  6. 11.06Waste Carrier Licence Check
  7. 11.07Spill Report
  8. 11.08Spill Kit Inspection
  9. 11.09Fuel-Storage Inspection
  10. 11.10Dust Monitoring Record
  11. 11.11Noise Monitoring Record
  12. 11.12Vibration Monitoring
  13. 11.13Water/Discharge Inspection
  14. 11.14Pollution Incident Report
  15. 11.15Environmental Inspection
  16. 11.16Environmental Complaint Register
12Accidents and Emergencies15 entries

Emergency arrangements, incident reporting, first aid, drills and follow-up.

  1. 12.01Accident/Incident Report
  2. 12.02Accident Register
  3. 12.03Near-Miss Report
  4. 12.04Near-Miss Register
  5. 12.05Investigation Report
  6. 12.06Root-Cause Investigation
  7. 12.07Corrective-Action Tracker
  8. 12.08RIDDOR Assessment/Checklist
  9. 12.09RIDDOR Register
  10. 12.10First-Aid Treatment Record
  11. 12.11Emergency Drill Record
  12. 12.12Rescue Plan
  13. 12.13Work-at-Height Rescue Plan
  14. 12.14Confined-Space Rescue Plan
  15. 12.15Spill/Emergency Response
13Commissioning and Handover27 entries

Commissioning coordination, test evidence, O&M, handover readiness, completion and aftercare.

  1. 13.01Commissioning Plan
  2. 13.02Commissioning Programme
  3. 13.03Commissioning Tracker
  4. 13.04System Completion Tracker
  5. 13.05Testing Tracker
  6. 13.06Witness Schedule
  7. 13.07Test-Sheet Register
  8. 13.08Commissioning Defect Register
  9. 13.09Client Training Schedule
  10. 13.10Client Training Sign-off
  11. 13.11O&M Tracker
  12. 13.12O&M Index
  13. 13.13O&M Review Sheet
  14. 13.14H&S File Index/Tracker
  15. 13.15As-Built Register
  16. 13.16Test Certificate Register
  17. 13.17Warranty Register
  18. 13.18Asset Register
  19. 13.19Spares Register
  20. 13.20Keys/Access-Card Register
  21. 13.21Handover Checklist
  22. 13.22Area/Room Handover Sheet
  23. 13.23Practical Completion Readiness Checklist
  24. 13.24Outstanding Works Register
  25. 13.25Defects-Period Tracker
  26. 13.26Aftercare Tracker
  27. 13.27Final Close-out Checklist
14Building Safety and Higher-Risk Buildings (HRB)13 entries

Building-safety information, evidence coordination, change records and higher-risk building controls.

  1. 14.01Competence Declaration/Evidence
  2. 14.02Construction Control Plan
  3. 14.03Change Control Plan
  4. 14.04Change Control Log
  5. 14.05Building Regulations Compliance Evidence Register
  6. 14.06Golden Thread Information Register
  7. 14.07Mandatory Occurrence Reporting System
  8. 14.08MOR Register
  9. 14.09Fire & Emergency File
  10. 14.10Building Control Submission Tracker
  11. 14.11BSR Change-Control Tracker
  12. 14.12Completion-Certificate Information Tracker
  13. 14.13Partial Completion Strategy — Where Applicable

Choose from 338 catalogue entries across 14 categories. Documents are tailored with your company logo, colours and business or project information. Request individual documents or a coordinated pack to suit your work.

Project & document examples

Explore the Riverside examples.

Project pack overview — watermarked example

Project pack overview

A project brief brought together with concept drawings, delivery stages and programme information.

View preview
Site access and logistics — watermarked example

Site access and logistics

Selected site-access and ground-floor drawings from the Riverside concept drawing package.

View preview
Ground-floor concept — watermarked example

Ground-floor concept

Selected site-access and ground-floor drawings from the Riverside concept drawing package.

View preview
Baseline programme — watermarked example

Baseline programme

Compare the original linked plan with the completed update, showing progress and the recorded completion variance.

View preview
Completed programme — watermarked example

Completed programme

Compare the original linked plan with the completed update, showing progress and the recorded completion variance.

View preview
NCR register — watermarked example

NCR register

Track the non-conformance, responsible party, target date and verified close-out in one register.

View preview
Completed NCR form — watermarked example

Completed NCR form

Follow a completed report through root cause, correction, prevention, verification and before-and-after evidence.

View preview
Corrective action and close-out — watermarked example

Corrective action and close-out

Follow a completed report through root cause, correction, prevention, verification and before-and-after evidence.

View preview
Before-and-after photo evidence — watermarked example

Before-and-after photo evidence

Follow a completed report through root cause, correction, prevention, verification and before-and-after evidence.

View preview
ITP register and tracker — watermarked example

ITP register and tracker

Connect inspection activities, hold and witness points, responsible parties and evidence references.

View preview
Inspection request, result and release — watermarked example

Inspection request, result and release

Show the inspection criteria, recorded result, linked action and decision on whether work can proceed.

View preview
Monthly project tracker — watermarked example

Monthly project tracker

Bring work elements and monthly progress into a clear annual reporting view.

View preview

Illustrative, watermarked examples. Concept drawings are not for construction. Your commissioned documents carry your company logo, colours and project information.